
SRNE Lithium Battery 2.56kWh, 12V 200Ah
KES 90,500
- 2.56 kWh
- 12 V
- 200 Ah
- Manufacturer warranty
- Nationwide delivery
- accepted
SRNE Lithium Battery 2.56kWh, 12V 200Ah. Supplied and installed by Oriel Power across Kenya.
This product requires professional installation. Add installation at checkout, or book a site survey and our engineers will confirm the design before anything is fitted.
Never mix battery and inverter voltage classes: a low-voltage (51.2V) battery cannot be connected to a high-voltage inverter input, and vice versa. If you are unsure, talk to an engineer before ordering — the check takes minutes and prevents damaged equipment.
The warranty period for this product is confirmed before purchase — ask us and we will tell you the term and what it covers.
Returns and warranty claims both start by contacting us with your order number. The full terms are on our delivery and returns page.
SRNE Lithium Battery 2.56kWh, 12V 200Ah. Supplied and installed by Oriel Power across Kenya.
This product requires professional installation. Add installation at checkout, or book a site survey and our engineers will confirm the design before anything is fitted.
Never mix battery and inverter voltage classes: a low-voltage (51.2V) battery cannot be connected to a high-voltage inverter input, and vice versa. If you are unsure, talk to an engineer before ordering — the check takes minutes and prevents damaged equipment.
The warranty period for this product is confirmed before purchase — ask us and we will tell you the term and what it covers.
Returns and warranty claims both start by contacting us with your order number. The full terms are on our delivery and returns page.
Similar products
Common questions
Why LiFePO4 rather than lead-acid?
LiFePO4 gives thousands of cycles and discharges deeply; lead-acid gives hundreds, and only halfway.
Can I add more batteries later?
Usually — most stack within the same model family. Never mix brands, models, or old with new.
What does 51.2V versus high-voltage mean for me?
Single-phase hybrids take 51.2V; three-phase take high-voltage banks. Never interchangeable.
Talk to us
An engineer answers, not a call centre.
Call us or send a WhatsApp message and an engineer will come back to you.
0723 204 342Chat on WhatsApp
